Central Main Line

From Eratosthenia
Jump to navigation Jump to search
Central Main Line
Overview
Type Heavy rail
Status In use
Locale Centralia, Westerland
Termini Ellford Junction
Jennings
Operation
Opening 19 August 1884; 139 years ago (1884-08-19)
Owner New Ingrean Railways Corporation
Technical
Track gauge 3 ft 6 in (1,067 mm)
Electrification Overhead 25 kv AC
Route map
Eastern Main Line
to Port Frederick
Kingsbury Line
to Kingsbury Central
Belfield
Black Mountain
East Shepton
Shepton
Cross Country Main Line
to Dairyton
Southern Main Line
to Port Balfour
West Shepton
St Collen
TransCapital
Limit of operations
Mount Beacon
Rosenham
Stonybrook
Philipstown
Philipstown Depot
Wellingrove Line
to Swanbrook
Yarrocott
Littlehowe
Romney
Warrendene
Bluff Rock
Irby
Earnestvale
Tancred
Sunnyside
Jennings
Port of Jennings

The Central Main Line is a railway line that runs through the centre of New Ingrea. The line begins at Ellford Junction near Kingsbury and runs through Shepton, Philipstown and Earnestvale before terminating at Jennings, on the shore of the Chatham Sea.

Description of route

The line predominantly consists of an electrified double track built to intercity speed standards. Between Ellford Junction and Shepton, the line consists of four tracks, allowing for passenger and freight traffic to move through the core of the railway centre without hindrance. For most of the line, trains can travel at speeds of up to 100 miles per hour (160 km/h). Between Earnestvale and Jennings, the line is not electrified, and consists of a single track.

References and notes

Other links