Template:Infobox rail transport

From Eratosthenia
Jump to navigation Jump to search
Rail transport in New Ingerland
Railroad yard in Addington, Christchurch 01.JPG
Operation
Owner New Ingerland Railways Corporation
Major operators
Statistics
Passengers 22.6 million (2010)
Freight 61 million tons (2012/13)
System details
Total track 1,145 miles (1,843 km)
Gauge 3 ft 6 in (1,067 mm)
(Cape gauge)
Electrification 25kV AC
Features
Tunnels 21
Tunnel length 10 miles (16 km)
Longest tunnel 14,645 feet (4,464 m)
Brassey No.4, ABNY/VERN
Bridges 1,115
Longest bridge 2,372 feet (723 m)
at Williamsdene, BEAU
Highest elevation 4,494 feet (1,370 m)
Beacon Pass, CENT
Map
File:Map-railways.png

For use on the Rail transport in New Ingerland page.